Riverwood Cliff House Updating work in progress (work done on March 10, 2024)
Large-scale update before Dweller Slot implementation.
We have expanded and renovated.
Improved the foundation. Until now, we had been using square stones (concrete blocks that would never collapse) to support the foundation, but we replaced them with a different material. An outside passage was added to the replaced base. There is a fence so you don't have to worry about falling accidents. The outside passageway provides access to the entrance from the expanded basement floor and the entrance from the renovated and expanded hidden room. (The entrance to the hidden room is located in a place that cannot be seen from the outside passage.)
Added basement area.
Area B1 has a second dining room and three bedrooms.
Existing storage was relocated to accommodate the refrigerator addition.
Expanded the Trophy Room on the 2nd floor. Added stairs (as the capacity of the building has increased, the existing ladder stairs would cause residents to be stranded)
Replacing the sink in the 2nd floor toilet (close to the front entrance).
Added toilet lever. Replacement around the faucet in the wash basin.
A toilet has been added to the children's room on the 1st floor. Removed the secret door that separated the nursery playroom area from the nursery bedroom.
Added windows to walls in children's rooms (bedrooms and playrooms) and hallways.
An entrance has been added on the west side of the 1st floor. (Door treated as a back door)
The basement (vampire's room) leading from the main character's room has been expanded and an emergency exit has been added.